REVELSTOKE SAFETY & HEALTH COMMITTEE

MINUTES - September 17, 2001

 


Held: September 17, 2001
Co-Chairman: D. Zatko

Members in Attendance:
Management: D. Zatko, J. Galloway
Union Reps: P. Bede (BLE), B. Gardali (UTU), R. Mellish (UTU), J. Wells (BMWE), K. Jones (B&B)
Guests: Nil


Meeting called to order 0835. Minutes of August 2, 2001 meeting read and adopted.

SAFETY ACTION PLANS
Field Ops - Safety Walkabout completed August 7/8/9.
Bruno to supply Committee with Action Items to be completed.
E/S - N/A

UNFINISHED BUSINESS:

Item 0103-02: High Visibility Apparel - many Safety Hazard Reports submitted concerning
vests becoming caught on equipment.
Action (0109) Policy and catalogue in place. Employees questioning if arrangements can be
made for payroll deduction as not everyone has a credit card. D. Zatko to investigate. MOTION TO CARRY


Item 0103-04: P. Bede inquired re Laurie Shed repeaters for locotrol.
Action(0109) System has been upgraded, still encountering some problems.
Crews should check system going through sheds.
Sub-committee to meet with S&C Supvr S. Peters. MOTION TO CARRY

Item 0103-05: P. Bede inquired possibility of increasing speed restriction for new potash cars from
15 mph to 20 mph.
Action(0109) Issue elevated to senior E/S management. J. Galloway to investigate progress.
MOTION TO CARRY

Item 0104-03: K. Jones advised re spill response containers are not marked for tare weight.
Requested that they be weighed and decal applied.
Action(0109) Smaller containers are being used - extra stock should be stored separately.
K. Jones advised new shipment of supplies received that has to be stocked.
Tappen container needs to be identified. K. Jones to advise further.
MOTION TO CARRY

Item 0107-01: B. Gardali reminded Committee members that Running Trades employees have
not yet been fit tested for gas masks.
Action(0109) B. Santucci advised Committee issue of fit testing has been elevated to Senior
Management for advisement. He also advised he will make arrangements for a
Trainer to show employees how to use the tunnel respirators. MOTION TO CARRY

Item 0107-03: P. Bede again requested disinfectant spray or wipes for units.
Action(0109) Wipes have been obtained for crews upon request. MOTION TO DELETE

Item 0108-01: P. Bede requested a small refrigerator to be made available for crews
to store their lunches while waiting for their train to arrive.
Action(0109) Suggestion that small fridge in meeting/training room be moved to the ice room for
crews. D. Zatko to investigate. MOTION TO CARRY


CORRESPONDENCE & BUSINESS ARISING

J. Wells informed Committee status of issue re E/S employees being provided cleaning facilities for
clothing being contaminated by hazardous substance that had been elevated to the ES System H&S
Policy Committee. The ES System H&S Policy committee has recommended the issue of supplying
washers and dryers be resolved by Workplace H&S Committee. Committee discussed and has
recommended that a service contractor be looked into for cleaning and supplying coveralls in
lieu of washers and dryers.


INCIDENT REVIEW

   Incident                              Cause                              Prev.Measures
|-------------+------+-------------+----------------+--------------------|
|Unit derailed|NON |Mtn Minerals |3rd Party |Track inspected- |
|and |FRA |Spur | |no damage. |
|rerailed. | |M.45.8 Mtn | | |
| | |Sub | | |
| | |08.02.01 | | |
| | |19:00 | | |
|-------------+------+-------------+----------------+--------------------|
|Derailment |FRA |Revelstoke |Dragging |Mechanical Services |
|car |M/S |Yard |equipment |repaired car |
|SOO62670 | |M.125.0 Mtn |(brake rigging) | |
| | |08.03.01 | | |
| | |11:52 | | |
|-------------+------+-------------+----------------+--------------------|
|Movement of |CRV |Golden Yard |Failure to apply|Formal investigation|
|unsecured |FOPS |M.142.00 Wind|sufficient |discipline/education|
|cars / | |Sub |number of | |
|run through | |08.03.01 |handbrakes | |
|switch | |19:00 |on cars | |
|-------------+------+-------------+----------------+--------------------|
|Run Thru |NON |Revelstoke |Human Error - |Formal investigation|
|Switch |FRA |Yard |failure |Switch repaired. |
| |FOPS |M.10 Shu Sub |to ensure switch| |
| | |08.08.01 |lined | |
| | |12:55 | | |
|-------------+------+-------------+----------------+--------------------|
|Run Thru |NON |Golden Yard |Human Error - |Informal |
|Switch |FRA |M.142.0 Wind |failure |investigation |
| |FOPS |Sub |to ensure switch| |
| | |08.14.01 |lined | |
| | |11:45 | | |
|-------------+------+-------------+----------------+--------------------|
|Detraining |LTI |M.42.3 Mtn |Failure to |IRR with employee |
|from unit, |FOPS |Sub |ensure firm | |
|twisted | |08.15.01 |footing | |
|knee on | | | | |
|ballast | | | | |
|-------------+------+-------------+----------------+--------------------|
|Derailment of|FRA |M.23.7 Shu |Wide gauge due |Necessary repairs |
|6 potash |E/S |Sub |to |made |
|cars | |08.17.01 |missing spikes | |
| | |09:00 | | |
|-------------+------+-------------+----------------+--------------------|
|Switching |NON |Revelstoke |Failure to |Discussed with |
|yard crew |FRA |Yard |control speed |crew |
|discovered | |08.23.01 |of cars using | |
|car off | |12:05 |handbrake | |
|centre | | | | |
|casting. No | | | | |
|derailment | | | | |
|-------------+------+-------------+----------------+--------------------|
|Train R11-30 |CRV |M.126.90 Shu |To be determined|Formal Investigation|
|passed signal|FOPS |Sub | | |
|displaying | |08.30.01 | | |
|Stop | |06:23 | | |
|-------------+------+-------------+----------------+--------------------|
|Bug bite |MIR |Kamloops |Bug |Room to be inspected|
|causing |FOPS |Bunkhouse |(undetermined) | |
|swelling | |09.02.01 |bite | |
| | |13:00 | | |
|-------------+------+-------------+----------------+--------------------|
|Riding unit |LTI |Golden South |Failure to |Formal investigation|
|fell into |FOPS |Yard |ensure firm |Unit downloaded for |
|handrails | |09.03.01 |handhold and |speed |
|jamming | |09:45 |secure footing | |
|right hand | | | | |
|-------------+------+-------------+----------------+--------------------|
|Run Through |NON |Golden South |Human error - |Informal |
|Switch |FRA |Yard |failure to |Investigation |
| | |09.04.01 |ensure switch | |
| | |0300 |lined | |
|-------------+------+-------------+----------------+--------------------|
|Run Through |NON |Golden South |Human error - |Informal |
|Switch |FRA |Yard |failure to |Investigation |
| | |09.08.01 |ensure switch | |
| | |1800 |lined | |
|-------------+------+-------------+----------------+--------------------|
|Stepped into |MIR |Revelstoke |Failure to |Site inspected-no |
|a pocket |FOPS |Station |ensure firm |irregularities |
|between ties,| |09.10.01 |footing/clear |noted. IRR with |
|fell striking| |0305 |path |employee |
|knee cap on | | | | |
|platform | | | | |
|-------------+------+-------------+----------------+--------------------|
|Train 607-119|CRV |M.34.1 |Investigating |Formal investigation|
|passed a Stop|FOPS |Mountain Sub | | |
|signal 341. | |09.15.01 | | |
| | |2246 | | |
|-------------+------+-------------+----------------+--------------------|

 
   


SAFETY HAZARD REPORTS (Incomplete)

SHR0102-03: Lead locomotives (9000 series) - seats uncomfortable
Action (0109) Mechanical Services advises some new seats have been installed. Units should
not be leaders but continue to be. Committee has exhausted all avenues, recommend
elevate to Policy Committee. MOTION TO CARRY

SHR0106-12: Rocky Mountain locomotives 8014 and 8011 have a black compound falling through the
ceiling panel.
Action(0109) R. Mellish informed Committee problem has been improving. MOTION TO DELETE

SHR0106-17: Watering AC4400 locomotives at Sicamous (and other locations) poses a situation where
a risk of falling off the locomotive because lack of handrail. Suggest a proper fitting
for the hose to allow the nozzle to stay secure by itself while watering and/or apply grab
iron to ensure stability while standing on the platform while watering.
Action(0109) K. Jones informed Committee fittings have been supplied at Sicamous. Fitting to be
further supplied at Rogers, Glacier, Field, Salmon Arm and Revelstoke.
MOTION TO CARRY

SHR0108-02: Donald backtrack - high weeds causing poor visibility, tripping hazard.
Action (0109) TMS Sadek to advise. MOTION TO CARRY

SHR0108-04: Diesel fumes Macdonald tunnel, cab of unit filled with fumes due to windows with
faulty seals, compounded by ventilation failure.
Action(0109) Investigation revealed RTC failed to properly purge tunnel. NMC advises formal
investigation and education taken place with RTC involved with regard to
proper tunnel purges. MOTION TO DELETE

SHR0108-05: Unit 9540 work area very dirty. Dust and dirt in heater fans, floor, etc.
Action(0109) Locomotive Specialist confirmed unit had been reported. This is the proper
procedure to be follow when encountering dirty units. This particular unit had been
a remote and should not have been used as a leader until cleaned.
J. Galloway to follow up. MOTION TO CARRY


SAFETY HAZARD REPORTS (New)

SHR0109-01: Fuel oil filling station ladder not secure - Albert Canyon
Action (0109) D. Kermack advises B&B are replacing this tank with a 5' double wall tank within the
next couple of months. Ladder has been removed. MOTION TO DELETE

SHR0109-02: Bridge 113.7 Mtn walkway on south side has a drop off on the east and west ends.
Snow could hide this hazard.
Action (0109) B&B has installed 18" gabion at each end of walkway. MOTION TO DELETE

SHR0109-03: Crew calling - NMC lineup inaccurate resulting in crew being unprepared to double
back to Revelstoke.
Action (0109) J. Galloway advises issue has been investigated with parties involved.
MOTION TO DELETE

SHR0109-04: Safety vests not fitting properly - caught on equipment.
Action (0109) See Item 0103-02 - hi-vis apparel is available through an order catalogue
providing employees with optional proper fitting apparel. Employeee concerned has
been properly fitted with a vest. MOTION TO DELETE

SHR0109-05: Field Bunkhouse - possible asbestos exposed in west wing bathroom main floor
and Room #28 heating pipe.
Action (0109) B&B inspected/tested and found the material in the bathroom is not asbestos. The
wrapping around the pipes, as in room #28, is a fiberglass with an aluminum foil.
MOTION TO DELETE
SHR0109-06: Switch hard to line for back track Chase.
Action (0109) TMS R. Miller advised switch repaired. MOTION TO DELETE

SHR0109-07: R Taxi van arrived with improper plate displayed for passenger carrier insurance.
Action(0109) J. Galloway to contact R Taxi. MOTION TO CARRY

SHR0109-08: Cotton gloves currently supplied will not be adequate for colder weather.
Action(0109) Winter gloves have been ordered and will be supplied. MOTION TO DELETE

SHR0109-09: Unit 9554 - chemical toilet/floor drain - stains and odor.
Action (0109) JB Galloway to advise. MOTION TO CARRY


REPORTS OF SUB-COMMITTEES


Macdonald Tunnel - lack of cleaning - no manpower available.
Health & Wellness - moderate success, unfortunate lack of E/S gang participation. Thank you letter to participants.
Walkabout - Bruno to supply Action Item and Recommended Action to Committee.

DISTRICT HEALTH & SAFETY ACTION PREVENTION COORDINATOR REPORT

Level 2 H&S Training for BC Interior is scheduled for (FOPS) October 10/11/12 and ES Nov 6/7/8 at
the Revelstoke Station, starting time 0800.

Tunnel Respiratory Policy to be developed System wide.

NEW BUSINESS:

Item 0109-01: P. Bede received a request for switch at M.35 Mtn (Golden Yard) be relocated from
the south & north main to south/main and 4 track
Action(0109) To be investigated. MOTION TO CARRY

Item 0109-02: K. Jones recommended that the Terms of Reference be changed with regard to
Item A.2.i - site inspections to reflect the requirement of the Canada Labour Code.
Action(0109) Committee recommended wording be changed to "The Sub-Committee will
perform a complete safety audit of its jurisdiction as directed by the Canada
Labour Code". This change will be reflected in the next review of the Terms
of Reference. MOTION TO DELETE



Meeting adjourned 1020. Next meeting - Tuesday, October 9th.
November meeting scheduled for Monday, November 5th.


L. Sali
for D.A. Zatko
B. Gardali

    
   