Safety & Health Site Inspection

Detail Report

 

Date:   June 4 & 5, 2001                                            Location:  Shuswap Subdivision

 

Inspection Made By: Field Ops Site Inspection Sub-Committee

 

Class “A”             - A condition or practice likely to cause permanent disability, loss of life or body part and

                          extensive loss of structure, equipment of material.

 

Class “B”            - A condition or practice likely to cause serious injury/illness, resulting temporary

                          disability or property damage that is disruptive but less severe than Class “A”.

 

Class “C”            - A condition or practice likely to cause minor nondisabling injury/illness and/or non

                          disruptive damage.

 

Item

Location

Remarks, Comments, Recommendations

Action

By

Class

Done

S01

Mile .02

Large amount of vegetation from grain spills between rails on main tracks and sidings across Subdivision.

EAP

C

 

S02

Mile 4.9 North Track

Bell Pole spur – weeds and trees still present which creates tripping hazards.

EAP

C

 

S03

Mile 6 North Track

Tires on right of way near crossing.

EAP

C

 

S04

Entire Subdivision

Ballast – shortage of ballast observed on subdivision at various locations, too many to record.

EAP

C

 

S05

Mile 11.9

Spike buckets on right of way.

EAP

C

 

S06

Entire Subdivision

Various locations along the right of way with new track material for this summers track program.  H&S will monitor in Fall site inspection.

 

C

 

S07

Craigellachie

Back tracks – weeds

EAP

C

 

S08

Mile 31.2 siding

Weeds are so high can not see flag slow order.

EAP

C

 

S09

Mile 44.3

Walkway approaching east end of bridge invites the public to climb onto the track and bridge.  Signs and removal the walkway recommended.

EAP

A

 

S10

Mile 44.3

Box of track debris is on the walkway of the bridge, tripping hazard.

EAP

C

 

S11

Sicamous Yard

Silica sand piles through out the yard creating a tripping hazard. 

RM

C

 

S12

Mile 51.1

Signal pole leaning towards lake, wires restrict movement for boats and pedestrians.

AB

C

 

S13

Mile 57.08

Crossing lights need to fixed account they are bent.

AB

C

 

S14

Mile 64.1

Shuswap station name sign missing.

RM

C

 

S15

Mile 70.5

Piles of scrap in the west leg of Wye at Tappen.

RM

C

 

S16

Mile 67.98

Glen Echo resort crossing has a new private crossing arm on the south side of the track which is activated by a code.  On the north side there are no signs or a gate.  There is a possibility of the public being on the crossing with their vehicle before activating the gate while southbound.  Recommend signs, another gate on north side or key pad on the north side to leave the resort.

AB

A

 

S17

Notch Hill Wye

Piles of scrap from TP&E creating a tripping hazard.

RM

C

 

S18

Mile 86.8

Track debris by switch, tripping hazard.

RM

C

 

S19

Mile 87.1

Scrap pile adjacent back track, tripping hazard.

RM

C

 

S20

Mile 87.21

Grease build up on crossing, potential slip hazard.

RM

C

 

S21

McCracken to Pritchard

115 lb rail on south track, question whether this track is to standards for the heavier trains and locomotives.

RM

B

 

S22

Mile 118.3

Culvert north side, no fall protection creates a falling hazard.

RM

A

 

S23

Mile 117

Moly Cop spur – the spur has tie debris hidden by weeds.

RM

C

 

S24

Mile 115.1

Pile of spikes adjacent south track, tripping hazard.

RM

C

 

S25

Mile 111.3

Ducks Spur – TP&E scrap piles, tripping hazard.

RM

C

 

S26

Mile 98.6

South side fall protection inadequate.  Creating a serious falling hazard.

RM

A